
Bowie Parks, Trails and Recreation: A Local’s Guide for 2026
August 27, 2026
Bowie City Services and Utilities: Trash, Water, Police, Permits and Who to Call
August 27, 2026Inside the City of Bowie, a six foot backyard fence needs two permits, one from Prince George’s County and one from the City, and the City will not accept your application until the county permit is already approved. That single rule trips up more new owners than any leaky roof, and it is a good example of why owning a home here comes with its own local playbook.
Own a home in Bowie? Know what it would sell for.
Bowie homes are taking almost twice as long to sell as last year, 21 days instead of 12, so the starting price matters more than it used to. Bruno will send you a written value range built from the closest recent sales near you. No obligation.
This guide covers what Bowie owners actually run into: which permits you need and from whom, the tax credits that cap your bill, how to appeal an assessment, what to fix first in a 1960s Levitt house, and a month by month calendar built around real City, county and state deadlines.
Do I need a City of Bowie permit, a county permit, or both?
If the house is inside city limits, usually both. Prince George’s County’s Department of Permitting, Inspections and Enforcement (DPIE) reviews construction codes and inspects the work. The City then issues its own building permit to confirm the project meets city code and the covenants that still apply in many neighborhoods.
The City application asks for a copy of the approved county permit, the county-approved stamped survey or site plan, the other documents you filed with the county, and the construction cost. You can apply online, fees are paid by credit card only, and the City says review normally takes 2 to 5 business days once the file is complete. Questions go to the Code Compliance Office at 301-809-3008.
In Fairwood, Mitchellville, most of Woodmore and the other unincorporated areas that share Bowie ZIP codes, the City step does not apply. You deal with the county, plus your HOA’s architectural review if you have one. Not sure which side of the line you are on? Read our guide to City of Bowie limits.
| Project (inside city limits) | Key City rules | Permits |
|---|---|---|
| Fence taller than 4 feet | 6 foot maximum; no fences in the front yard between the building line and the street; 25 foot setback where your rear line meets a neighbor’s front yard | County and City |
| Fence repair or replacement | Like-for-like repairs are fine; replacing the whole fence or several sections with new or different materials must meet current rules | Call Code Compliance first |
| Shed of 150 sq ft or more, or a second accessory building of any size | On lots of 20,000 sq ft or less: 200 sq ft maximum for all accessory structures combined, 15 feet tall, one story, rear yard only, at least 2 feet from side and rear lines | County and City |
| Additions, decks, porches and other work that needs a county building permit | City reviews the county-approved plans against city code and covenants | County and City |
Which tax credits should every Bowie owner check?
The Maryland Homestead Tax Credit limits how much your taxable assessment can rise each year on your primary residence. Per the State Department of Assessments and Taxation (SDAT) 2026 to 2027 rate table, the cap is 10% for state tax, 3% for Prince George’s County tax and 5% for City of Bowie tax.
It is not automatic. A 2007 law requires a one-time application, now filed through Maryland OneStop. To check yours, look up your address on SDAT’s Real Property Data Search; the status at the bottom of the page should read “Approved” or “Application Received.” New buyers are mailed an application once the deed records, and since 2021 settlement agents must hand you one at closing. SDAT’s homestead line is 410-767-2165.
The separate Homeowners’ Property Tax Credit is income based. Combined gross household income cannot exceed $60,000, and net worth must be under $200,000, not counting the home or retirement accounts. File by April 15 to see the credit on your July bill; the final deadline is October 1. The credit applies to taxes on up to $300,000 of assessed value. Call 410-767-4433 with questions.
What does the FY2027 city tax increase mean for my bill?
On May 4, 2026 the Bowie City Council raised the city rate from $0.40 to $0.58 per $100 of assessed value for fiscal 2027, the first increase in 16 years. SDAT’s 2026 to 2027 table lists the rates on a Bowie bill as $0.58 city, $0.878 county and $0.112 state, before the parks and planning and transit lines.
Here is the math on a $400,000 assessment. The city line alone goes from $1,600 to $2,320, an increase of $720 a year. Prince George’s County mails bills in July; owner-occupants pay in two installments, due September 30 and December 31, and other properties pay in full by September 30. The full breakdown is in our Bowie property tax guide.
How do I appeal my Bowie assessment?
SDAT reassesses every property once every three years and phases any increase in over the next three tax years. Reassessment notices go out in late December, and you have 45 days from the notice date to appeal. In the two years between reassessments you can file a petition for review by the first working day after January 1. If you bought between January 1 and July 1, you have 60 days from the transfer date.
There are three levels. First comes an informal supervisor’s hearing, and SDAT will send you its worksheet and comparable sales list beforehand. If you disagree, file with the Property Tax Assessment Appeals Board within 30 days of the final notice, then with the Maryland Tax Court within 30 days of that board’s order.
Your best evidence is sales on your own section’s lettered streets, plus photos of condition problems the assessor never saw. For context, the median Bowie sale ran about $264 per square foot in Bright MLS data, April to September 2026.
What should I upgrade first in a Levitt-era house?
Levitt and Sons built Belair from 1960 into the late 1960s, so most original systems are past their design life. Put money in this order: water and drain lines (original cast iron or galvanized), the electrical panel and any original wiring, moisture control at the slab or crawlspace, then windows. Ask whether every past addition was permitted and properly tied into the roof.
Homes built before 1978 come with lead paint obligations. Sellers must give buyers the federal lead disclosure, and contractors who disturb painted surfaces must be certified under the EPA’s Renovation, Repair and Painting rule. If your section is on City of Bowie water and sewer, consider a camera scope of the sewer lateral, especially under mature trees.
City water customers paid $7.11 per thousand gallons for water and $10.20 per thousand gallons for sewer in fiscal 2026, and the City offers a rebate on water filter systems. More on the original models is in our Belair at Bowie guide and Levitt homes overview.
A Bowie homeowner’s calendar
| When | What to do |
|---|---|
| First working day after Jan 1 | Deadline for an SDAT petition for review in a non-reassessment year |
| January | City residents: undecorated Christmas trees go out with Wednesday yard waste. If you got a reassessment notice in late December, the 45 day appeal clock is running. |
| March to April | Service the air conditioning, clean gutters after spring storms, walk the roof line and exterior paint |
| April 15 | File the Homeowners’ Property Tax Credit to see it on the July bill |
| July | County tax bills arrive. WSSC rates change July 1. |
| September 30 | First installment (or full payment) of property tax due |
| October 1 | Final deadline for the Homeowners’ Property Tax Credit |
| Late October to mid December | City vacuum leaf collection, two passes per neighborhood. In 2025 it began the week of October 27 and ended the week of December 15. Rake piles to the curb, not the street, before your collection week starts. |
| December 31 | Second property tax installment due |
Every week, City yard waste goes out Wednesday in brown paper bags (no plastic), with branches no thicker than 3 inches or longer than 4 feet, and nothing over 50 pounds. Set it out after 5 p.m. Tuesday. Unincorporated county customers get yard trim pickup on Mondays, year-round.
Who do I call?
- City Hall: 301-262-6200, 15901 Fred Robinson Way
- City Code Compliance (permits, fences, sheds): 301-809-3008
- City Public Works (trash, yard waste, leaves): 301-809-2344
- Prince George’s County 311: 301-883-4748
- Prince George’s County Treasury (tax bills): 301-952-4030
- SDAT Homestead Credit: 410-767-2165
More service details are in our Bowie city services guide and the Bowie FAQ.
Thinking about a project or a sale?
Before you spend on a remodel, find out what it does to your value. Start with a Bowie home value estimate, or call or text Bruno at (240) 418-3809, 9 a.m. to 9 p.m. daily, to walk through which upgrades pay back on your street.
Email me my street’s sold report
Tell us your street and Bruno will email you what homes on and around it actually sold for, from Bright MLS closed sales, with what each one had going for it. No obligation.
Sources: City of Bowie Building Permit FAQ, City of Bowie fence rules, City of Bowie shed rules, City of Bowie leaf collection, City of Bowie yard waste, SDAT Homestead Tax Credit, SDAT Assessment Appeal Process, Prince George’s County property taxes, Prince George’s County residential collections, EPA Renovation, Repair and Painting Program, Bright MLS data, April to September 2026.




